Network Rail
CTB have just been awarded our fifth section of works in North London for Network Rail.
This includeds one 3x6 metre coffer dam, 60 metres of 610mm steel sleeve to be installed beneath the rail infrastructure, sub ducting , grouting of the steel sleeve and sinking a 2.0 metre cason shaft .
Works to commence within the next four weeks